Solar Power Plants have mushroomed in different parts of the world as Global Solar Demand has increased by more than 150% in 2010.Solar Power Plants built on the Ground differ from that put on the Roofs of Houses as they require to go through feasibility,environmental assessment,grid connection,siting etc. which is typical for a large industrial project.In general the smaller the size of the solar installation,the lower the number of regulations required.Here are the steps required in building a Solar Power Plant

1) Site Identification

2) Preliminary Financial Analysis

3) Land Leasing or Buying

4) Basic Engineering Design/Technology Selection

5)Permitting

6) Power Purchase Agreement

7) Selection of EPC

8) Financing of the Solar Project needs to be done.

9) Testing and Connection to Grid

10) Ongoing O&M

Note building a Solar Power Plant requires Project Management skills typical of an industrial project with some unique characteristics.ADLER Solar team has that skills .The process in fact requires more detail and solid execution skills.

A Solar Plant can be built in 3 months to 2 years depending on the expertise and the permitting required.

ADLER Solar . Delhi Gurgaon Noida Ncr
If it’s a SOLAR POWER PLANT installation you’re looking for, call us for a free survey. .
Mob: +91 9971170911 ,+91 9910733911
Email : info@adlergroup.in
Web : http://www.adlergroup.in